WORK / ODD JOBS / MALHEUR FIELD STATION

PRELIMINARY DESIGN

Malheur Field Station

Housing for the scientists who've been coming to the Great Basin's dark skies and open range since 1971 — the research never slowed down; the beds just never caught up.

This is what “how it gets there” looks like — the sketch, the structural problem-solving, the moment a plan changes because the site asked a better question than the brief did. Shown here in order, start to finish.

PRELIMINARY DESIGN → DESIGN DEVELOPMENT → CONSTRUCTION → COMPLETED

PRELIMINARY DESIGN

Site overview

Malheur Field Station

Housing prototypes

Laying out proposed research housing

Full Study

New housing unit Type ‘A’

DESIGN DEVELOPMENT

Vertical Section Perspective

Vertical connections

Horizontal Section Perspective

Corresponding rooms and connections

Material Study

Material and finish study and connections